Case Study 2

Replacing an existing small side extension with a larger extension

Service – design, planning, structural engineering, building regulations and buildwork quotations

The client had produced sketched plans and elevations of his ideas which I translated on to CAD, once the ideas were computerised and with a few little tweaks we were in a position to put the proposal into planning. During the 8 week planning period we started detailing and pricing the required works and once planning was granted we commissioned the structural engineering and send the drawings off to the building inspectors which was done on notice.

 

Drawing Hobson

 

 

exterior cropped

Exterior – Rear

image editted

Internal – Kitchen Area